a) Insulate garden office.
b) First fix to the electrics within the Garden Office and the installation of a 100amp armoured cable over 1m into the ground which runs from the main house via a separate 80amp fused supply. This is in order to provide enough peak power requirement if everything was turned on simulatenously (required by the regulations).
c) Then whole building was plasterboarded out and then plastered.
d) The floors finished, either with cork tiling or in main rooms with varnish.
e) A kitchen installed
f) The rooms painted
g) Electrics connected (2nd fix)
This took all of April 2007 to complete